History

  1. 1965

    Founded as a sole proprietorship by Karl Boll

  2. 1967

    First deliveries to the automotive industry

  3. 1971

    New construction in the Hartheim-Feldkirch industrial estate

  4. 1981

    Change of the company form to GmbH

  5. 1983

    Introduction of a PPS system (ERP system)

  6. 1984

    Introduction of dial-up processing

  7. 1985

    Introduction CAD

  8. 1992

    Introduction of a QM system according to ISO 9001

  9. 1996

    Certification according to ISO 9001

  10. 1997

    Introduction of 3D tool design

  11. 1998

    Certification according to VDA 6.1

  12. 2001

    Introduction of an environmental management system

  13. 2005

    Introduction of a CRM system with electronic document archive

  14. 2006

    Introduction of fully automatic quality monitoring with cameras

  15. 2008

    Certification according to ISO/TS 16949

  16. 2012

    Commissioning of new 650 tonne 2-component injection moulding machine

  17. 2017

    Introduction of a clean room

  18. 2017

    Certification according to IATF 16949

  19. 2017

    Reorganisation of the storage area, investment in a mobile racking warehouse

  20. 2018

    Commissioning of three new injection moulding machines incl. robot removal

  21. 2020

    New energy-efficient controlled room ventilation and air conditioning put into operation in the clean room

  22. 2021

    Commissioning of new injection moulding machines

  23. 2022

    also active as a system provider for the first time

  24. 2024

    Company-wide LED lighting
     
    Introduction of laser welding technology

  25. 2025

    60 years of KABO-PLASTIC GmbH
     Certification according to the European environmental standard EMAS + ISO 14001
     Inauguration of the new basement cold-storage hall

  26. 2026

    250 kWp rooftop PV system for in‑house power generation
     
    Expansion of the 2‑component (2K) machine park